To the central content area

Potential polluting factory investigation, Maintenance of monitoring well, farmland sites sampled for regular monitoring

Absrtact
For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contamination in Changhua county in 2015” has been advanced, which involves groundwater monitoring wells maintenance and groundwater investigation, Unlisted farmland reexamine, Potential polluting factory investigation, to supervise and verify pollution remediation of contaminated sites, dealing with emergency cases, and administrative assistances. The plan had been executed from January 16th 2015 to December 15th 2015, and the results of implementation are summarized as follows: At first, the task of groundwater monitoring wells inspection has been implemented twice this year and there were totally 9 maintenance works finished. All slug tests of groundwater monitoring wells were completed, and six purges and five foreign matter exclusion of monitoring well were implemented according to the slug test results. Besides, there were 34 monitoring wells surveys accomplished in both dry and wet season, and whose results all less than Groundwater Pollution Control Standards. There were 240 farmlands finished sampling for regular monitoring, and the analysis results showed 36 farmlands exceeded Soil Pollution Control Standards. In addition, the work team explored 27 factories with pollution potential in Changhua County. According to the exploration, there were 16 plants chosen and sampled, and the results demonstrated 5 factories’ soil samples and 1 plants’ groundwater over the control standards. With respect to the mission of to supervise and verify pollution remediation of polluted sites, those sites had been examined at least bimonthly, and there were 18 listed sites completed verification and 4 sites sampled for regular monitoring. There were entirely 22 emergency cases implemented during plan period.
Keyword
Soil , Groundwater, Contamination
Open
top